Once you memorize these 74-344 Q&A, you will get 100% marks.


right here we're! genuine study, exact end result.

74-344 test questions | 74-344 exam results | 74-344 training material | 74-344 Practice test | 74-344 pass exam - bigdiscountsales.com



74-344 - Managing Programs and Projects with Project Server 2013 - Dump Information

Vendor : Microsoft
Exam Code : 74-344
Exam Name : Managing Programs and Projects with Project Server 2013
Questions and Answers : 97 Q & A
Updated On : December 6, 2017
PDF Download Mirror : 74-344 Brain Dump
Get Full Version : Pass4sure 74-344 Full Version

Ensure your success with this 74-344 question bank


The best way to get accomplishment in the Microsoft 74-344 exam is that you ought to acquire dependable preliminary materials. We guarantee that killexams.com is the most direct pathway towards certifying Microsoft Managing Programs and Projects with Project Server 2013 exam. You will be triumphant with full certainty. You can see free questions at killexams.com before you purchase the 74-344 exam items. Our mimicked tests are in different decision the same as the real exam design. The questions and answers made by the confirmed experts. They give you the experience of taking the real test. 100% assurance to pass the 74-344 real test.

killexams.com Microsoft Certification contemplate guides are setup by IT experts. Bunches of understudies have been whining that there are excessively numerous questions in such huge numbers of training exams and study aides, and they are quite recently tired to manage the cost of any more. Seeing killexams.com specialists work out this extensive form while still certification that all the information is secured after profound research and examination. Everything is to make comfort for competitors on their street to accreditation.

We have Tested and Approved 74-344 Exams. killexams.com gives the most exact and most recent IT exam materials which practically contain all information focuses. With the guide of our 74-344 exam materials, you don't have to squander your opportunity on perusing main part of reference books and simply need to burn through 10-20 hours to ace our 74-344 real questions and answers. Also, we furnish you with PDF Version and Software Version exam questions and answers. For Software Version materials, It's offered to give the hopefuls reproduce the Microsoft 74-344 exam in a real environment.

We give free refresh. Inside legitimacy period, if 74-344 exam materials that you have bought updated, we will intimate you by email to download most recent version of Q&A. In the event that you don't pass your Microsoft Managing Programs and Projects with Project Server 2013 exam, We will give you full refund. You have to send the checked duplicate of your 74-344 examination report card to us. Subsequent to affirming, we will rapidly give you FULL REFUND.

In the event that you get ready for the Microsoft 74-344 exam utilizing our testing software. It is anything but difficult to prevail for all confirmations in the main endeavor. You don't need to manage all dumps or any free downpour/rapidshare all stuff. We offer free demo of every IT Certification Dumps. You can look at the interface, question quality and convenience of our training exams before you choose to purchase.

Killexams.com Huge Discount Coupons and Promo Codes are as under;
WC2017 : 60% Discount Coupon for all exams on website
PROF17 : 10% Discount Coupon for Orders greater than $69
DEAL17 : 15% Discount Coupon for Orders greater than $99
DECSPECIAL : 10% Special Discount Coupon for All Orders



74-344 Discount Coupon, 74-344 Promo Code, 74-344 vce, Free 74-344 vce, Download Free 74-344 dumps, Free 74-344 braindumps, pass4sure 74-344, 74-344 practice test, 74-344 practice exam, killexams.com 74-344, 74-344 real questions, 74-344 actual test, 74-344 PDF download, Pass4sure 74-344 Download, 74-344 help, 74-344 examcollection, Passleader 74-344, exam-labs 74-344, Justcertify 74-344, certqueen 74-344, 74-344 testking


How long practice is required for 74-344 test?

I skip in my 74-344 exam and that was now not a easy bypass however a terrific one which I should inform all of us with proud steam filled in my lungs as I had got 89% marks in my 74-344 exam from studying from killexams.com.

Shortest questions that works in real test environment.

I was very disappointed when I failed my 74-344 exam. Searching the internet told me that there is a website killexams.com which is the resources that I need to pass the 74-344 exam within no time. I buy the 74-344 preparation pack containing questions answers and exam simulator, prepared and sit in the exam and got 98% marks. Thanks to the killexams.com team.

Do not spill huge amount at 74-344 guides, checkout these q and a.

The fine IT examination prep i have ever come upon. definitely my 74-344 exam is in some days, however I feel so equippedand reassured, particularly now that Ive read all of the fantastic critiques here. The testing engine seems to be very helpful, its clean to consider questions and answers, plus, in case you keep going via them time after time, you startseeing a larger picture and understand the principles higher. to date, Ive had outstanding revel in with Killexams!

Do you need braindumps of 74-344 exam to pass the exam?

Me and my roommate had been living collectively for a long term and we've got a variety of disagreements and arguments regarding diverse matters however if there is one thing that both people agree on it's far the truth that this killexams.com is the best one on the internet to apply if you want to pass your 74-344 . both of us used it and had been very satisfied with the outcome that we were given. i was capable of carry out properly in my 74-344 check and my marks had been actually remarkable. thanks for the steerage.

Where can I get help to prepare and pass 74-344 exam?

i'm very lots happy together with your test papers specially with the solved issues. Your take a look at papers gave me courage to appear in the 74-344 paper with self belief. The result is seventy seven.25%. all over again I entire heartedly thank the killexams.com organization. No different way to pass the 74-344 exam other than killexams.com model papers. I personally cleared different assessments with the assist of killexams.com query bank. I endorse it to each one. in case you need to skip the 74-344 examination then take killexams.com assist.

74-344 questions and answers that works inside the actual check.

I had appeared the 74-344 exam last year, but failed. It seemed very hard to me because of 74-344 topics. They were really unmanageable till I found the questions & answer study guide by killexams. This is the best guide I have ever purchased for my exam preparations. The way it handled the 74-344 materials was superb and even a slow learner like me could handle it. Passed with 89% marks and felt above the world. Thanks Killexams!.

Passing the 74-344 exam is not enough, having that knowledge is required.

I got this percent and handed the 74-344 exam with ninety seven% marks after 10 days. Im extraordinarily fulfilled by the end result. There may be tremendous stuff for accomplice level confirmations, but concerning the expert stage, I assume this is the principle strong plan of action for excellent stuff, particularly with the examination simulator that offers you a risk to practice with the appearance and sense of a real examination. that is a totally enormous brain dump, true examine manual. this is elusive for cutting side assessments.

in which can i am getting 74-344 real exam questions and solutions?

I chose killexams.com due to the fact I didnt absolutely need to bypass 74-344 exam however I desired to skip with exact marks so that i might make a good affect on anyone. as a way to accomplish this I wished outdoor resource and this killexams.com became inclined to provide it to me. I studied over right here and used 74-344 inquiries to put together. I were given the grand prize of nice rankings within the 74-344 check.

So smooth training of 74-344 exam with this question bank.

I cleared all the 74-344 tests effortlessly. This website proved very beneficial in clearing the checks as well as expertise the ideas. All questions are explanined very well.

Passing 74-344 exam was my first experience but Great Experience!

I missed a couple of inquiries only on the grounds that I went clear and didnt recollect the answer given in the unit, however since I got the rest right, I passed and solved 43/50 questions. So my recommendation is to learn all that I get from killexams.com Q&A - this is everything I need to pass. I passed this exam because of killexams. This pack is 100% faithful, a huge portion of the inquiries were the identical as what I got on the 74-344 exam.

See more Microsoft dumps

MB3-215 | MB7-255 | MB2-707 | 70-533 | 70-521-Csharp | 77-887 | 98-365 | 70-333 | MB2-708 | MB5-198 | 70-483 | MB2-706 | 70-761 | 70-511-CSharp | 70-547-CSharp | 70-553-VB | 77-420 | 70-561-CSharp | 70-541-VB | MB6-892 | 70-523-VB | 70-465 | 70-475 | 111-056 | 74-100 | 70-342 | MB5-292 | MB3-207 | 70-569-CSharp | 70-696 | 70-573-VB | 83-640 | 70-413 | MB4-218 | MB5-626 | 10-184 | 70-417 | MB6-527 | 70-464 | MB5-199 | 71-687 | 70-565-VB | 70-545-VB | 70-685 | 70-554-CSharp | 70-354 | 70-511-VB | 70-548-Csharp | MB2-716 | MOS-W2E |

Latest Exams added on bigdiscountsales

1Z0-453 | 210-250 | 300-210 | 500-205 | 500-210 | 70-765 | 9A0-409 | C2010-555 | C2090-136 | C9010-260 | C9010-262 | C9020-560 | C9020-568 | C9050-042 | C9050-548 | C9050-549 | C9510-819 | C9520-911 | C9520-923 | C9520-928 | C9520-929 | C9550-512 | CPIM-BSP | C_TADM70_73 | C_TB1200_92 | C_TBW60_74 | C_TPLM22_64 | C_TPLM50_95 | DNDNS-200 | DSDPS-200 | E20-562 | E20-624 | E_HANABW151 | E_HANAINS151 | JN0-1330 | JN0-346 | JN0-661 | MA0-104 | MB2-711 | NSE6 | OMG-OCRES-A300 | P5050-031 |

See more dumps on bigdiscountsales

000-971 | E20-320 | M2090-733 | LOT-822 | 1Z0-040 | HP0-S12 | EE0-011 | A2030-280 | 98-349 | 000-029 | BAS-011 | 642-416 | C2090-737 | 300-080 | M2060-729 | 00M-608 | 00M-646 | M2020-733 | 000-N21 | 650-299 | P2040-060 | 000-974 | 74-678 | MB6-527 | HP0-P20 | 030-333 | 700-260 | 0B0-109 | 98-361 | HP2-K16 | 000-550 | 70-461 | C_ISR_60 | 000-N08 | 70-347 | 000-N14 | RTRP | 310-100 | HP0-634 | P2070-055 | 190-513 | HP2-Z09 | C2020-702 | P2170-015 | 700-101 | 000-456 | COG-205 | 000-011 | M2065-659 | HP3-C30 |

74-344 Questions and Answers


D. Have project managers modify their automatic updates to also automatically publish the acceptance.

Answer: D


QUESTION: 85

You are a project manager in an organization that uses Project Server 2013. Single- entry mode is disabled. The Only allow task updates via Tasks and Timesheets option is enabled. Project team members submit updates to tasks through Project Web App (PWA).A team member submits a status update to you for approval. The team member later informs you that they made a typing mistake in the status update. You need to correct the status update. What should you do?

  1. Instruct the team member to enter the correct information and send the status again.
  2. Accept the status update in Project Professional 2013 and correct the user's mistake.
  3. Reject the status update in Project Professional 2013 and have the user send the correct status.
  4. Instruct the team member to recall the timesheet.

Answer: A


QUESTION: 86

You are a project manager for a company that uses Project Server 2013 in Project Server Permission Mode. You have been managing a project for several months. You go on vacation, and you delegate your project management responsibility to one of your coworkers. Your coworker accepts multiple status updates on the project. When you return, you notice that no project updates are visible in Project Web App (PWA), and there are no status updates awaiting approval. You need to ensure that the previously accepted status updates are visible in PWA. What should you do?

  1. Set the date range in the Approval's page to include last week's updates.
  2. Have your team resubmit last week's status updates.
  3. Have your team resubmit last week's timesheet updates.
  4. Publish the task updates from the Status History page.

Answer: D


QUESTION: 87


You work as a project manager in an organization that uses Project Server 2013. All project managers belong to the Project Management Office (PMO) and use Project Professional 2013. A member of the PMO is responsible for initiating a new project schedule in Project Server and fills in critical project-level fields such as Sponsor and Project Budget. The PMO publishes the new project and then, through email, instructs the project manager to complete a detailed schedule. You are responsible for planning and managing the schedule, including approving task updates from team members. After speaking to your team members, you discover that task updates have been submitted, but you are not receiving them; instead, these updates are going to the person in the PMO who initially set up the schedule. You need to solve this problem. What should you do?

  1. Instruct the person in the PMO to open the schedule in Project Professional 2013 and change the status manager to you for all tasks.
  2. Instruct the person in the PMO to open the schedule in Project Professional 2013 and change the Publish field to Yes for all tasks.
  3. Open the schedule in Project Professional 2013 and change the status manager for all tasks to you.
  4. Open the schedule in Project Professional 2013 and change the assignment owner for all tasks to you.

Answer: C


QUESTION: 88

You are a portfolio manager at an organization that uses Project Server 2013. You supervise five very large projects. Each project has its own project manager and a project team with many resources. One of your main activities is reviewing all documentation of the five projects. The project teams are constantly updating and publishing new documents in the Project Site of each project. You need to implement an information review process that meets the following requirements:
 Receive a notification every time a document is updated or published in the Project Sites.
 Have a centralized way to view the notifications.
 Implement the process in the least amount of time. What should you do?

  1. Go to Project Site of each project and select the Follow option for each published document. Review your Newsfeed periodically for news about the documents.
  2. Go to the User page of each member from the five project teams and select the Follow user option. Review your Newsfeed periodically for news about each user.
  3. Go to Project Site of each project and select the Follow site option. Review your Newsfeed periodically for news about the Project Sites.

  4. Ask the project managers and the project teams to send you an email every time they update or create a new element in the project site. Review your inbox periodically for notifications from the project team.

Answer: C


QUESTION: 89

You are a program manager in the Project Management Office (PMO). Your organization is implementing Project Server 2013. Only the IT, human resources, and financial departments will use Project Server 2013, and each department will use its own set of enterprise custom fields. You plan to create an Enterprise Project Template (EPT) with two project details pages (PDPs) named pdp1 and pdp2, which will have the following functions:
 pdp1 will be used as the new project page, and it will contain only default project fields.
 pdp2 will be used to fill out custom information about the project, and it will contain all of the project's enterprise custom fields.
You need to ensure that, when project managers access the pdp2, they will only see the enterprise custom fields of their own departments.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

  1. Add three entries in the RBS lookup table, one for each department.
  2. Add three entries in the Department lookup table, one for each department.
  3. In the edit resource page, set the appropriate department in the Resource Department field for each project manager.
  4. In the edit resource page, set the appropriate department in the Resource Breakdown Structure field for each project manager.
  5. In the edit enterprise custom field page, set the appropriate department in the Department field for each enterprise custom field.
  6. In the edit enterprise custom field page, select the option Behavior controlled by workflow for each project enterprise custom field.

Answer: B, C, E


QUESTION: 90

You are managing two projects named Proj1 and Proj2. Proj1 has a milestone named Milestone!. Proj2 has a milestone named Milestone2. You need to create a relationship between both projects that meets the following requirements:
 Milestone2 depends on Milestone1.
 The relationship provides visibility without affecting Milestone2's schedule. What should you do?

  1. Open Project Professional 2013 and create a master project with Proj1 and Proj2 as subprojects. Make Milestone2 a predecessor of Milestone1. Save and publish the master project.
  2. Open Project Professional 2013 and create a master project with Proj1 and Proj2 as subprojects. Make Milestone1 predecessor of Milestone2. Save and publish the master project.
  3. Open Proj1 in Project Professional 2013 and create a deliverable for Milestone1. Save and publish Proj1. Open Proj2 in Project Professional 2013, add a new dependency for the deliverable on Proj1, and link the dependency to Milestone2. Save and publish Proj2.
  4. Open Proj2 in Project Professional 2013 and create a deliverable for Milestone2. Save and publish Proj2. Open Proj1 in Project Professional 2013, add a new dependency for the deliverable on Proj2, and link the dependency to Milestone1. Save and publish Proj1.

Answer: C


QUESTION: 91

You are a program manager in the Project Management Office (PMO) of an organization that uses Project Server 2013. The Project Site Provisioning Mode for your organization allows users to choose when to provision project sites. You use Project Web App (PWA) to create a new enterprise project named Sub1 that will be inserted as a subproject in your existing master project named Master. You need to create a new project site for Sub1 as a subsite of the existing Master Project Site. What should you do?

  1. Open the Sub1 project for editing in PWA, click the Project Site button, and provision the Sub1 site under the Master Project Site.
  2. Open the Master project in Project Professional 2013, insert Sub1 as a subproject, publish, and provision the Sub1 site under the Master Project Site.
  3. Open the Sub1 project for editing in PWA, publish, and provision the Sub1 site under the Master Project Site.
  4. Open the Sub1 project in Project Professional 2013, publish, and provision the Sub1 site under the Master Project Site.

Answer: D


QUESTION: 92

You are a program manager in the Project Management Office (PMO) of an organization that is implementing Project Server 2013. You plan to include five of

your organization's departments in the first rollout of Project Server 2013. You need to develop a project creation process that meets the following requirements:
 Each department must have its own Project Site template.
 Each department must have its own Project Schedule template.
 The project creation process needs to be developed in the least amount of time. What should you do?

  1. Create five projects, one for each department. Send the project file via email to the respective department leader. Instruct them to use the project file as a template every time they need to create a new project.
  2. Create five Microsoft SharePoint sites and five projects, one for each department. Publish the projects into the respective SharePoint site. Instruct the department leads to create a copy of their SharePoint site and to use the project file as a template each time they need to create a new project.
  3. For each department, create one enterprise project template (EPT), one Project Site template, and one project template. Associate the Project Site template and the project template with the EPT.
  4. Create a single Microsoft SharePoint site and one project for each department, and then publish the projects into the SharePoint site. Instruct the department leads to create a new sub-site from the SharePoint site and to use the appropriate project file as the template each time they need to create a new project.

Answer: C


QUESTION: 93 DRAG DROP

You are a program manager with administrator rights/ and you use Project Server 2013 to implement a data warehouse. You set up your program master project with sub- projects for each implementation area. You need to use the Project Center view to create a custom view of the data warehouse projects for your vice president. Which four actions should you perform in sequence? (To answer, move the appropriate four actions from the list of actions to the answer area and arrange them in the correct order.)

Answer:


QUESTION: 94

You are a portfolio manager in an organization that uses Project Server 2013. You plan to review the milestones status of a project named Proj1. You need to create a graphical view of all milestones of Proj1 that allows you to see the Start and Finish dates of each milestone. You need to accomplish this goal in the least amount of time. What should you do?

  1. Open Microsoft Visio and make a data connection against the Project Server database. Write a query that returns the Name, Start, and Finish dates of all milestones of Proj1. Create a chart with that information.

  2. Open Microsoft Excel and make a data connection against the Project Server database. Write a query that returns the Name, Start, and Finish dates of all milestones of Proj1. Create a chart with that information.
  3. Create a Project view named Milestones with the Task Name, Start, and Finish fields. Filter the view by the Milestone field so that the view only shows milestone tasks. Open Proj1 in Project Web App (PWA), choose the Milestones view, and select all the milestones. Then add them to the Timeline.
  4. Create a Microsoft SQL Server Reporting Services (SSRS) report with a data connection against the Project Server database. Write a query that returns the Name, Start, and Finish dates of all milestones of Proj1. Create a chart with that information.

Answer: C


QUESTION: 95

You are a project manager for an organization that uses Project Server 2013. You manage a schedule with a Project Site, which includes a section for documents that team members and other stakeholders need. You have a very large number of documents that you want to put into the Project Site. You need to upload these documents by using the most efficient method. What should you do?

  1. In the Project Site, select the document folder and select the New Documents option in the screen. Then upload files one at a time.
  2. In the Project Site, select the document folder and, in your source document list, select the files to upload. Drag them to the "drag files here" section of the screen.
  3. In the Project Site, select the document folder and select the Upload Document button from the ribbon. Select the Multiple Documents option. Then select all the documents that you want to upload.
  4. In the Project Site, select the document folder and select the Import Documents button from the ribbon. Then select the documents you want to upload.

Answer: B


QUESTION: 96

You are a portfolio manager for an organization that uses Project Server 2013. You plan to create several portfolio reports for the executive team. You need to ensure that your first report shows a list of all projects in your organization with timephased information regarding how the Actual Work and the Actual Cost have varied on a monthly basis. What should you do?

  1. Create a Project Center view with the following project fields: Name, Start Date, Finish Date, Actual Work, and Actual Cost. Export the view to Microsoft Excel, and

    group the projects by using the Finish Date column. Save the file into the Reports library in Project Web App (PWA).
  2. Create a Pivot Table in Microsoft Excel that gets data from the OLAP Portfolio Analyzer data connection. Include the dimensions of Project List and Time, and the measures of Actual Work and Actual Cost. Save the file into the Reports library in Project Web App (PWA).
  3. Create a Project Center view with the following project fields: Name, Start Date, Finish Date, Actual Work, and Actual Cost. Export the view to Microsoft Excel, and group the projects by using the Start Date column. Save the file into the Reports library in Project Web App (PWA).
  4. Create a Pivot Table in Microsoft Excel that gets data from the Project Server - Simple Projects List data connection. Include the dimensions of Project List and Time, and the measures of Actual Work and Actual Cost. Save the file into the Reports library in Project Web App (PWA).

Answer: B


QUESTION: 97

You are a project manager for an organization that uses Project Server 2013. Synchronization is enabled. Project Sites at your organization are created by a default template when a new schedule is published. You are the Project Owner of a schedule. You have a Project Site associated with this schedule. You need to quickly change the look and colors of your schedule's Project Site. What should you do?

  1. In the Project Site, select the Edit Page option from the ribbon and modify the Project Site.
  2. Since your organization is using default Project Sites, ask the Project Server administrator to create another Project Site template with the look that you desire.
  3. In the Project Site, select the Change the look option and modify the Project Site based on the available templates and color schemes.
  4. Since your organization uses default Project Sites, ask the Project Server administrator to change the default look so it aligns with the color and look you desire.

Answer: C


Microsoft 74-344 Exam (Managing Programs and Projects with Project Server 2013) Detailed Information

74-344 - Managing Programs and Projects with Project Server 2013


74-344 Test Objectives


Create enterprise projects and portfolios (25–30%)
  • Define strategic alignment
    • Define business drivers, create multiple driver prioritizations, analyze consistency ratio, rate projects against business drivers, determine primary cost constraints, determine resource constraints

  • Optimize portfolios
    • Set project dependencies, create a portfolio analysis, review and modify prioritizations in an analysis, force projects in and out of analysis, determine hired resources, compare and run simulations for project portfolio selection, add additional constraints

  • Create a new enterprise project
    • Create a project by choosing a specific project type and going through a workflow, create a Microsoft SharePoint task list project, create SharePoint item lists for ideation and requests, use workflow approvals, import projects through Project Professional, create and manage project schedules using Project Web App, save and check in projects

  • Create a program with master projects and sub-projects
    • Insert sub-projects, create cross-project task dependencies, create a temporary master project, calculate sub-project summary fields, display a master project in Project Web App
Preparation resources
  • Project portfolio management solutions guide (white paper)
  • Aligning projects with strategic drivers (Project Server 2013)
  • Create a sample Project Web App workflow
Plan enterprise projects and resources (25–30%)
  • Manage resources and teams
    • Edit resources with Project Web App, edit resources with Project Professional, create team resources, create team assignments, add a team task to a task page or timesheet, map resource roles (portfolio analysis)

  • Build a resource plan
    • Build a team for a resource plan, build a resource plan for a project, set resource utilization, use committed versus proposed assignments

  • Build a project team
    • Build a Project Team through Project Professional, build a Project Team through Project Web App, replace generic resources, work with proposed assignments, import a team resource plan

  • Resolve resource over-allocations across projects
    • Use leveling tools; use Team Planner, Task usage, and Resource Center availability views; evaluate how SharePoint task list projects impact availability

  • Baseline enterprise projects
    • Set a protected baseline, set a baseline from Project Web App, set a baseline from Project Professional, clear a baseline, copy a baseline
Preparation resources
  • Plan for performance and capacity in Project Server 2013
  • Plan user access in Project Server 2013
  • Plan for Project Server 2013 deployment
Track and collaborate on an enterprise project (25–30%)
  • Select a tracking method
    • Use percent complete, hours per period, actual work remaining, freeform, done, and not done fields

  • Manage task assignments
    • Publish assignments, select a status manager, select an assignment owner, set the published values for individual tasks

  • Update tasks and timesheets
    • Submit and recall timesheets, insert and remove tasks, reassign tasks, update Task Status from SharePoint My Tasks, submit updates from My Tasks

  • Approve tasks and timesheets
    • Accept task updates from tasks or timesheets, view impact of updates on a project, reject updates, approve and reject timesheets, manage delegations

  • Update a project schedule
    • Reschedule uncompleted work, update cost resources, publish schedule changes, utilize task update history, update schedules with protected user updates, close tasks for updates
Preparation resources
  • Task mode settings (Project Server 2013 settings)
  • Add SharePoint task list data to Project Server 2013
  • Timesheet and statusing
Manage configurable enterprise objects (20–25%)
  • Customize Project Web App views and reports
    • Create a portfolio report using Microsoft Excel, create dashboards, copy and edit views, set default views, rename field names, group, filter, and sort views

  • Manage and extend Project Online and Project Server
    • Create and manage enterprise project templates, define enterprise custom fields, define Project Server workflows, define enterprise global objects, extend with Office Store apps, add social elements

  • Manage risks, issues, and deliverables
    • Add risks and issues, add documents, add deliverables, set a dependency on a deliverable, synchronize deliverables with projects, link related items

  • Customize a project site
    • Add Document Library, add Lists, add Calendar, add Folders, modify site layout, create program (master-sub) structure using sub-sites
Preparation resources
  • Configure reporting for Project Web App (Project Server 2013)
  • Enterprise custom fields and lookup tables in Project Web App
  • Managing issues, risks, and documents in Project Web App


References:


Pass4sure Certification Exam Questions and Answers - www.founco.com
Killexams Exam Study Notes | study guides - www.founco.com
Pass4sure Certification Exam Questions and Answers - st.edu.ge
Killexams Exam Study Notes | study guides - st.edu.ge
Pass4sure Certification Exam Questions and Answers - www.jabbat.com
Killexams Exam Study Notes | study guides - www.jabbat.com
Pass4sure Certification Exam Questions and Answers - www.jorgefrazao.esy.es
Killexams Exam Study Notes | study guides - www.jorgefrazao.esy.es
Pass4sure Certification Exam Questions and Answers and Study Notes - www.makkesoft.com
Killexams Exam Study Notes | study guides | QA - www.makkesoft.com
Pass4sure Exam Study Notes - maipu.gob.ar
Pass4sure Certification Exam Study Notes - idprod.esy.es
Download Hottest Pass4sure Certification Exams - cscpk.org
Killexams Study Guides and Exam Simulator - www.simepe.com.br
Comprehensive Questions and Answers for Certification Exams - www.ynb.no
Exam Questions and Answers | Brain Dumps - www.4seasonrentacar.com
Certification Training Questions and Answers - www.interactiveforum.com.mx
Pass4sure Training Questions and Answers - www.menchinidesign.com
Real exam Questions and Answers with Exam Simulators - www.pastoriaborgofuro.it
Real Questions and accurate answers for exam - playmagem.com.br
Certification Questions and Answers | Exam Simulator | Study Guides - www.rafflesdesignltd.com
Kill exams certification Training Exams - www.sitespin.co.za
Latest Certification Exams with Exam Simulator - www.philreeve.com
Latest and Updated Certification Exams with Exam Simulator - www.tmicon.com.au
Pass you exam at first attempt with Pass4sure Questions and Answers - tractaricurteadearges.ro
Latest Certification Exams with Exam Simulator - addscrave.net
Pass you exam at first attempt with Pass4sure Questions and Answers - alessaconsulting.com
Get Great Success with Pass4sure Exam Questions/Answers - alchemiawellness.com
Best Exam Simulator and brain dumps for the exam - andracarmina.com
Real exam Questions and Answers with Exam Simulators - empoweredbeliefs.com
Real Questions and accurate answers for exam - www.alexanndre.com
Certification Questions and Answers | Exam Simulator | Study Guides - allsoulsholidayclub.co.uk

Comments

Popular posts from this blog

Pass4sure SY0-501 Practice Tests with Real Questions

Just memorize these CTFA questions before you go for test.

CompTIA SY0-501 Dumps and Practice Tests with Real Questions